Our Products
Repair & Maintenance Services
1 Products availableHeat Exchangers
1 Products availableChillers
1 Products availableGenerators, Turbines & Power Plants
1 Products availableDryers
1 Products availablePollution Control Equipment
1 Products availableIndustrial Blowers, Coolers & Fans
1 Products availablePollution Control Machines & Devices
1 Products availableMachinery Repairs
1 Products availableOur offered Product range includes 2 and 3 Phase separators, 2 Phase separator units, 4 Phase separators, chillers equipment and heat exchangers equipments.
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : As per logistics of transport
Delivery Time : As per Contracct terms
We manufacture and supply all types of 2 & 3 phase separators fr Oil & Gas as well as all other process industries.
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : As per transport logistics
Delivery Time : Based on volume
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : As per transport logistics
Delivery Time : Based on volume
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : As per transport logistics
Delivery Time : Based on volume
Additional Information:
Payment Terms : L/C
Packaging Details : Inspection, Logistics, etc as per industrial standards and norms. L/C @ Sight (FOB basis) or payment on Ex-factory. 1 year warranty. AMC extras based on need basis. Design will conform to TEMA and ASME specs of manufacturing standards. If needed HTRI calculations for Thermal (Heat Transfer Analysis) will be given at extra cost.
Additional Information:
Payment Terms : L/C
Packaging Details : L/C At sight (FOB) or payment after despatch from factory after inspection
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : As per transport logistics
Delivery Time : Based on volume
We fabricate and supply heat exchangers for Marine Engines as per the client’s specifications. These marine engine parts are convenient to install and are made in compliance with the set industrial standards.
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : As per logistics of transport
Delivery Time : As per Contracct terms
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : As per dimensions and size - depends on logistics and location of delivery.
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : As per transport logistics
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : As per transport logistics
Delivery Time : Based on volume
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : Standard packaging as per logistics of supply based on weight and dimensions.
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : As per transport logistics
Delivery Time : As per Contracct terms
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : As per logistics of transport
Delivery Time : As per Contracct terms
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : As per transport logistics
Delivery Time : As per Contracct terms
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : As per transport logistics
Delivery Time : Based on volume
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : As per transport logistics
Delivery Time : As per Contracct terms