Post Buy Requirement
Shree Ashutosh Industries

Shree Ashutosh Industries

Verified 5.0/5

Our Products

  1. Machines And Equipments 5 Products available
  2. Industrial Machinery

    2 Products available
  3. Construction Machinery & Equipment

    2 Products available
  4. Trolleys

    1 Products available
  5. Gearboxes

    1 Products available
  6. Rolling Machine

    1 Products available
  7. PVC, HDPE, FRP & Plastic Pipes

    1 Products available
  8. Others Products 3 Products available

Jigs, Casting Dies, Die Casting Moulds & Moulding Tools

Our Complete range of products are mould, Concrete Pipe Mold and Pipe Mould.

Mould

* 2meter & 2.5 meter length are available as per IS 458 & Customer Requirement.* All Class of Moulds Are Available in Plane Ended, Flush Joint, Spigot, Socket & R.R. Joint.* Moulds are Complete with M.S. SheetPlate, AngleFlat, Tie rods, Nutbolts, C.I. Endrings or M.S. Endings R.R. Joint.(Note : Rings can be made from M.S. Casting - Not Febricated)
View Complete Details

Concrete Pipe Mold

2meter & 2.5 meter length are available as per IS 458 & Customer Requirement.
All Class of Moulds Are Available in Plane Ended, Flush Joint, Spigot, Socket & R.R. Joint.
Moulds are Complete with M.S. Sheet/Plate, Angle/Flat, Tie rods, Nutbolts, C.I. Endrings or M.S. Endings R.R. Joint.
(Note: Rings can be made from M.S. Casting - Not Febricated)
View Complete Details

Pipe Mould

  • Min. Order (MOQ) 1 Piece(s)
The Reinforced cage is first prepared on the collapsible reinforcing machine by hand process. The cage is then placed inside the pipe mould, which is then hoisted up and mounted horizontally on the Runner machine. It is rotated by 'speed variater Machine. The rotation is kept slow in the beginning and then the speed is increased. The concrete mixture is prepared material by mixing cement stone, metal and sends respectively. The cement concrete is fed into the moulds during rotation, which spreads inside evenly. The time required for completion of this operation depends upon the diameter and class of the pipe. The pipes are kept mould for 24 hours. On the following day the pipes are removed from the moulds and submersed in water in the curing tank for about 15-20 days depending upon the class of the pipe

Additional Information:

Payment Terms : L/C, T/T

Packaging Details : Standrard Export Packing

View Complete Details
Tell Us What are you looking for? Will call you back

Contact Us

  • Mitesh Ashodiya (Shree Ashutosh Industries)
  • Survey No : 476, Plot No. 20-20-22-23-24-25, Rachna Industrial Zone, Near to Dadaji Lifescience Private Ltd. Padavala, Rajkot, Gujarat 360024, GIDC - 360002
  • Share us via
  • Call 08068051320 Ext. 661