Our Products
This set up is designed to study of strain gauge utilization
as displacement measuring transducer. The set up consists
a strain gauge bridge with small cantilever, micrometer for
displcement, the signal conditioner circuit and a digital display
calibrated for displacement measurment. The set up have its
own inbuilt regulated dc supplies.
This set up is designed to study of strain gauged load cellutilization as torque measuring transducer. The set up consists a straingauge bridge, the signal conditioner circuit and a digital display calibratedfor torque / angle measurment. The set up have its own inbuilt regulateddc supplies |
MEASUREMENT OF AIR VELOCITY BY AIR VELOCITY TRANSDUCER |
Velocity is a vector quantity and defined as the
'rate of change of displacement'and may be treated
as 'air flow rate'. The velocity can be measured by
optical techniques if the displacement is a linear
function.One procedurecalled Anemometer method.
The set up is based upon this technique. Thepresent
set up is built in two parts as (a) transducer unit and
(b) the signalconditioner and measurement unit.
The provided set is designed to study of capactivetransduceras water level measurement. It hasinbuilt excitation source, signalprocessing circuitryand a digital panel meter which can be adjusted to readdisplacement in mm of level . The set up has a metallicparallel plate capacitoras transducer. Complete processis well prined in blocks with test pointsin form of socketsto observe / measure waveforms.
Position transducers are used widely in industrial and applications, among them the linear variable differential transformer ( LVDT ) is excellent in performance compared to potentiometeric transducer to measure position and displacement. Displacement is the vector representing a change in position of a point with respect to a refrence point. It can be either rotary or linear. The linear variable differential transformer type of displacement transducer particularly suitable as a short stroke, position measuring device. In given set up the open cage construction is provided to observe the basic construction of device.
Additional Information:
Payment Terms : L/C, D/A, D/P, Western Union,
Packaging Details : Standard
Delivery Time : 2 weeks