Our Product / Services
Construction Service
1 Services availableOres And Minerals
1 Products availableMortar
1 Products availableOur offered Product range includes Non Explosive Rock Demolition Consultancy, Concrete Demolition Principle, Safety Precautions, Principle of Working and Import Export Merchandising.
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : 20KG PAPER CARTON BOXES, EACH BOX WELL PACKED WITH 5KG POLYTHENE BAGS 4Nos.
Delivery Time : 1 WEEK
Additional Information:
Payment Terms : T/T
Packaging Details : 20 Kg boxes packed with FOUR 5 kg bags per box
Delivery Time : 7-21 DAYS
Type | Usable temperature | |||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
SCA-IV | 40oC-50oC ( 104oF-122 oF) | |||||||||||||||||
SCA-I | 25oC-40oC ( 77oF-104 oF) | |||||||||||||||||
SCA-II | 10oC-25oC ( 50oF-77 oF) | |||||||||||||||||
SCA-III | -5oC-10oC ( 23oF-50 oF) | |||||||||||||||||
» Pre-Drilled Hole Design table
![]() ![]() ![]() |
Additional Information:
Payment Terms : T/T
Packaging Details : 1-1.2 Tonne Pallets, 20Kg Export Quality Paper Box, 5Kg Packets With moisture proof cover
Delivery Time : 7-30 Days
Productive SCA 1 | 25-40oC |
---|---|
Productive SCA 2 | 10-25oC |
Productive SCA 3 | -5 To 10oC |
Drilling
Among available drilling techniques pneumatic drilling setup and mechanized hydraulic drilling setup are in practice for productive results.
Drilling Design Specifications
Hole Dia |
Mean Hole Distance Range |
Applicable for |
|
---|---|---|---|
For Rock |
For Concrete Structures |
||
25-32 mm |
6-8 Inch Or 15-20 CM |
6-8 Inch Or 15-20 CM |
Sub-surface Rock/Concrete demolition(If no free face) |
25-32 mm |
8-10 Inch Or 20-25 CM |
6-8 Inch Or 15-20 CM |
Surface Rock/Concrete demolition |
30-45 mm |
10-12 Inch Or 25-30 CM |
8-10 Inch Or 20-25 CM |
Above surface Rock/Concrete demolition |
30-45 mm |
12-14 Inch Or 30-35 CM |
10-12 Inch Or 25-30 CM |
Free boulder/concrete blocks with multi free faces |
Mixing
Expansive Mortar is a powder that must be mixed thoroughly with clear water in a ratio of 30 % (w/w) say 1.5-to-1.7 Lit for 5 Kg bag. We insist users to carry out a test in practical with various proportions from 1.5 to 1.7 Lit per 5 kgs (Most using proportion is 1.65 Lit/5Kg) to decide the correct proportion for better results. Gradually add the powder to water and stir all the time to obtain a smooth and LUMP-FREE mortar. Excessive water may delay the cracking process and less water may lead to starvation during reaction. Users are requested to follow the instructions mentioned on the bag.
Filling
After mix has been prepared it should be poured into the holes. as reaction starts quickly, pour the Expansive Mortar within 5-10 min after mixing. During filling do not maintain any delay in any particular hole Otherwise it may lead to non-homogeneous reaction resulting throw out of chemical. No Capping required. Do not keep any obstruction on Hole. For further information feel free to discuss with us.
Standard Consumption
Chemical Qty |
Water Qty |
Hole Dia. |
Total Consumption in RFT |
Remarks |
---|---|---|---|---|
20 Kg |
6.5 Ltr |
40 mm |
32 Ft appx. |
Water Qty Subject to change as per site conditions |
20 Kg |
6.5 Ltr |
32 mm |
36 Ft appx |
|
20 Kg |
6.5 Ltr |
25 mm |
42 Ft appx |
Free Surface
It is one of the significant factors that play an important role in cracking process. As expansive pressure acts towards free surface, it is necessary to ensure free surface at least at one edge (Other than Top face and Front Face) for a bottom free rock/boulder. If the rock/boulder is routed into the earth surface please email us photograph for the suitable drilling pattern to demolish the big boulder/rock rooted inside the earth. We have dedicated geologists and rock engineers to serve you the best.