Put down carefully casings and ribbed screens into bore-wells,Select gravel packing after checking soil status as plot quantity for screens depends on it,Ensure no empty space while gravel packing the pipe,Avoid high pressure and pressure in opposite direction while drawing water,Male thread and female thread are fixed either side of our casing, ribbed and screen pipes,Joints have better tensile power than others to carry more assembly weights to deeper levels.