Products / Services
  • Products / Services
  • Companies
  • Buy Leads
Post Buy Requirement

Synchronizing Panel

Listing ID #1552986

  • Supply Type Manufacturer, Exporter, Supplier
  • Preferred Buyer Location All over the world

In the event of power failure or imbalance of Voltage from the EB Incomer, DG I will get start automatically and get connected to the load with reference of EB breaker/EB supply, basing on the load....
View More Details
Send Enquiry

Company Information

  • Member Since 11 Years
  • Nature of Business Retailer

Ask for more detail from the seller

Contact Supplier

Product Details no_img_icon

In the event of power failure or imbalance of Voltage from the EB Incomer, DG I will get start automatically and get connected to the load with reference of EB breaker/EB supply, basing on the load DG II will start and get Synchronize with DG I and the load will be shared between both the DG Sets. When the EB supply is resumed the system will check for quality and stability of Voltage and the system will get revise Synchronize with EB Supply and the load will be smoothly transfer to EB supply without any interruption, the DG breakers will get switched off on pre set time and the DGs will get switched off after pre set cooling time.
Multiple Paralleling gen set and Grid control with internal load sharing and Synchronizing
Considering the percentage of power cut / load cutting. The either of DGs will start automatically basing on the loads and get Synchronized with EB Supply (Grid) and the load will be smoothly transfer to DG I accordingly, and the DG II will start automatically based on the pre set load.
When the EB supply is resumed the system will check for quality and stability of Voltage and the system will get revise Synchronization with EB Supply and the load will be smoothly transfer to EB supply without any interruption, the DG breakers will get switched off on pre set time and the DGs will be put off at the pre set cooling time.
The option of setting the supply from any of the source i.e. either EB supply or DG I or DG II or all the three sources, all the operations can be done in auto mode, and also in manual mode (in the case of emergency).
In case of any maintains in DG I, the system will automatically switch On the DG II and vice versa.
During the load sharing the system will automatically balance the load, and Synchronizer will display Active & revise load and other parameters on the display screen.


Tell us your Buy Requirement to Get Instant Response
Tell us what you need?

By clicking Get Quotes Now, I accept the T&C and Privacy Policy.

Looking for Synchronizing Panel?

Quantity
Seller Contact Details
Waiting for permission
To search by voice, go to your browser settings and allow access to microphone

Allow microphone access to search with voice