Company Information
Ask for more detail from the seller
Contact SupplierThe fixture, will be designed to rest, locate on the ID. The clamping will be through pneumatic swing clamp cylinders.Station 3 will be top chamfering station. This station will have a chamfering head with a counter sink drill mounted on it. The drilling head will have a vertical servo stroke for drilling feed.Station 5 will be back counter sink station. This station will have a unit head with counter sink drill mounted on it. The unit head will have a vertical servo stroke for feed.Station 6 will be inspection station. This station will have a pneumatic cylinder which will plunge into the drilled hole to check for hole.