Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    Dry Distemper, For By Brush., Plastered Interiors Ceilings.

    • ApplicationBy brush., Plastered interiors and ceilings.
    • FinishSmooth matt finish
    • Drying TimeSurface dry 1 hour. Recoatable after 8-12 hours. Normally two coats are enough.
    • ThinningUse water for mixing and making a paint of the powder provided.
    • Covering Capacity8-12 Sq. meters per Kg per coat.
    • Supply TypeExporter, Supplier, Retailer
    • Preferred Buyer Location All over the world
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 22 Years
    • building Nature of Business Retailer
    • Year of Establishment 1938

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    • FinishSmooth matt finish
    • ApplicationBy brush., Plastered interiors and ceilings.
    • ThinningUse water for mixing and making a paint of the powder provided.
    • Covering Capacity8-12 Sq. meters per Kg per coat.
    • Drying TimeSurface dry 1 hour. Recoatable after 8-12 hours. Normally two coats are enough.

    1001 Dry Distemper is a very economical wall coating for brick work and plaster. It has very good fastness to light.

     

    USES

    Ideal coating for decoration of houses, offices, factory sheds, hospitals, public building etc.

     

    Color Range :As per 1001 Dry Distemper shade card.
    Packing :20 Kg, 1.5Kg.
    Highlights :1001 Dry Distemper is ISI marked (IS:427) and made under strict quality control. Also preffered by most govt. departments.
    Shelf Life :1 Year in packed condition
    Flash Point :N.A
    Undercoats :1001 Cement Primer or 2 coats of 1001 dry distemper
    Directions of Use :

     

    1001 Dry Distemper is mixed with warm water in the ratio 300 to 400 ml per kg of distemper, and stirred till a creamy consistency is obtained. It should stand for about half an hour, after which more water is to be added in the ratio 400 to 500 ml per kg of distemper, and stirred vigorously to achieve brushing consistency. The material should be applied within 48 hours of mixing water. Apply 2 coats. Dry overnight between coats. Maximum overcoating interval - 48 hours.


    Share your requirements for a quick response!
    Tell us what you need?

    By clicking Get Quotes Now, I accept the T&C and Privacy Policy.

    Looking for Dry Distemper?

    Quantity
    Seller Contact Details
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice