Contact SupplierWe own a substantial storage space that is well-structured and maintained by the professionals. The final packaging and storing of the products is done after complete serialization to avoid last minute hassle. With the assistance of skilled professionals and high-grade packaging system, we can easily furnish customized packaging requirements of the customers.
Key points : Optimum viscosity Ensures strong adhesion Longer shelf life Purity Track Coat Track coated application is a light spray of Bitumen Emulsion, which may be hand or machine sprayed. It is used to ensure a good bond between an old and a new bituminous surfacing layer. It is normally applied very thin and evenly over the entire surface. Advantages Easy and uniform spray Low temperature cure High adhesive properties Prevent lateral movement of structural layers Water resistant and enchances easy drainage of water Provides an impervious layer to prevent water ingress from table below the road layers. Objectives To ensure a proper bond between existing surface and the new bituminous course being placed over it. To ensure longevity of the road, it is important that the new bituminous surface bonds firmly with underneath surface To coat and bond loose mineral particle on the surface of the surface layer To seal surface pores and make the surface water-resistant To impart structural stability and prevent lateral movement of layer To assist adhesion between the base and super impose surface course
Type of Surface | Qty. of Liquid Bituminious Material (kg.per 10 sq.mtr.) |
---|---|
Normal bitumen surface | 2.0 to 2.5 |
Dry and Hungry bitumen surface | 2.5 to 3.0 |
Granular surface treated with primer | 2.5 to 3.0 |
Non-Bituminous surface | 3.0 to 4.0 |
Granular base (not primed) | 3.5 to 4.0 |
Cement concrete | 3.0 to 3.5 |
Residue on 600 micron IS sieve % by mass | Max 0.05% |
---|---|
Viscosity @ 50 degree C (Saybolt), sec | 20-100 |
Storage stability after 24 hour, % Max | Less than 2 |
Binder - Residue by evaporation % Min. | Min 60% |
Setting Time | -20 to 50 minutes |