    Relay Coordination Study Service

    • Business TypeService Provider
    • Preferred Buyer Location India only

    In power system networks, protection must be designed so that protective relays isolate the faulted portion of the network, preventing equipment damage and operator injury, and ensuring minimal....
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 8 Years
    • building Nature of Business Service Provider
    • gst icon GST No. 27AAPCS5761E1ZZ

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Service Details

    • Company Details

    no_img_icon

    In power system networks, protection must be designed so that protective relays isolate the faulted portion of the network, preventing equipment damage and operator injury, and ensuring minimal system disruption, allowing service to the healthy portion of the network to continue.
    To achieve proper fault identification and fault clearance sequence, relay coordination is used. These relays must be able to distinguish between normal operating currents and short-term overcurrents caused by normal equipment operation, such as motor starting currents, transformer inrush currents, and sustained overcurrent caused by fault conditions. Power system relaying and overcurrent protection are concepts that are mutually dependent and contribute to the plant’s smooth operation. Protection coordination or protective device coordination research will include the calculation of protection relay settings as well as power system protection and switchgear such as MCB, Fuse, ACB, VCB, and so on.
    As protection is a major concern in any industry, and they rely on protective devices for the same, a relay coordination study and analysis is performed to ensure that the system’s safety operations are functioning correctly and to avoid nuisance tripping. The cause of nuisance tripping is the modification of protective devices and their settings during maintenance without appropriate study and analysis.
    A coordination study’s goal is to determine the characteristics, ratings, and settings of overcurrent protective devices that will ensure that the minimum unfaulty load is interrupted when protective devices isolate a fault or overload anywhere in the system. A coordination study should be carried out.


    Share your requirements for a quick response!
    Tell us what you need?

    By clicking Get Quotes Now, I accept the T&C and Privacy Policy.

    Looking for Relay Coordination Study Service?

    Quantity
    Contact Details
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice