Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    Quick Drying Primers

    • MOQ4 Litre
    • QUICK DRYING / AIR DRYING / FAST DRYING ENAMEL BASE PAINTRED / GREY
    • Supply TypeManufacturer, Supplier, Retailer
    • Preferred Buyer Location All over the world

    We are ranked among renowned Manufacturers & Suppliers of Quick Drying Primers in Pune, Maharashtra, India. Made from premium raw materials and using advanced machines, our Quick Drying Primers....
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 15 Years
    • building Nature of Business Retailer
    • gst icon GST No. 27AAIFP4510C1ZM

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    We are ranked among renowned Manufacturers & Suppliers of Quick Drying Primers in Pune, Maharashtra, India. Made from premium raw materials and using advanced machines, our Quick Drying Primers are easy to dry, reliable and durable. Our company offers Quick Drying Primers as per requirements in a variety of grades. Buyers can purchase Quick Drying Primers from us at competitive prices.
    Scope : A quick drying primer/Paints for use on structural steel. Provides a hard drying, Tough, formulated with rust inhibitors to resist corrosion on any metal surface, flows on smooth & covers completely with one easy to apply coat.

    • Recommended for use on bridges, cranes, towers, equipment, tanks etc.
    • Easy to apply.
    • Handlable within 30 minutes.
    • Recoatable when surface must be tack free.


    Product Data : (PRIMERS)

    TypeSingle Pack
    CompositionModified quick drying alkyd medium with suitably pigmented
    Viscosity (Ford Cup B4)90±10 Seconds
    Specific Gravity1.25±0.05
    ApplicationBrush/Roller/ Conventional Spray Gun
    Recommended DFT30±5µ per coat
    Theoretical Spreading Rate5-6 Sq. Mtr. / Liter
    Drying Time
    • Surface Dry-10-15 min
    • Tack Free- 1-2 hours
    • Hard Dry-over night
    Over coating intervalMin: Overnight
    Max: 2 Days
    Flash PointAbove 40ËšC
    ColourGrey, Red oxide
    Packing4,10 & 20 Liters
    ThinnerPragati make Q.D Thinner
    FinishGrey-Smooth & Matt
    Red oxide- Smooth & Matt/Glossy


    Resistance Guide :

    Chemical Resistance
    ExposuresSplash & SpillageMild Fumes/Outdoor Resistance
     PRIMERSPAINTSPRIMERSPAINTS
    AcidN/RN/RPoorPoor
    AlkalisN/RN/RPoorFair
    SolventsFairFairFairFair
    SaltGoodGoodGoodGood
    WaterGoodVery GoodGoodGood

    Temperature :

    • Continuous- 90Ëš C
    • Intermittent- 120Ëš C

    Weatherability : Good
    Flexibility :  Good
    Abrasion Resistance : Moderate

     

    Storage Life : Up to 6 month in intact condition or sealed the containers are kept under cover in a dry place under normal temperature conditions.

     

    Surface Preparation :
    Steel : remove grease, oil & other contaminants preferably by using degreasing solvent. Blast clean to a minimum of Sa2 ½ Swedish std. SIS 05 5900. For severe corrosion, blast to Sa 3 with a surface profile not exceeding 65 microns.
    If blasting is not practical, make full use of mechanical tools along with manual chipping & wire brushing to remove loose rust & scale to st. 2 Swedish std. SIS 05 5900. Excessive burning of steel is to be avoided. Thoroughly dust down all surfaces. Best results can be achieved if the manually cleaned surface is primed with protectomastic- self-priming surface tolerant coating; otherwise, treatment with metal conditioning solution will also produce satisfactory results.
    The surface should be clean & dry before application of primer coat.

     

    Application :

    • Mix the contents thoroughly before & during use.
    • Apply with suitable thinner for the recommended dry film thickness.
    • Brush / Roller: add up to 5% thinner if required during application.
    • Conventional spray: add up to 15-20% thinner depending on conditions. Use only standard equipment at an atomizing pressure of 3.5-4.9 Kg/cm2.

     

    Note :

    • Do not apply when temperature falls below 10Ëš C or rises above 50Ëš C & when relative humidity rises above 90%. Do not apply during rain Fog or mist.
    • Brushes & Roller should be cleaned with thinner otherwise, equipment is liable to be damaged.
    • Primed steel work should not be exposed with one coat for a long period.





    Additional Information

    • Packaging Details4 / 10/ 20 / 200 LITERS

    Product Images

    • Quick Drying Primers
    • Quick Drying Primers
    • Quick Drying Primers
    Share your requirements for a quick response!
    Tell us what you need?

    By clicking Get Quotes Now, I accept the T&C and Privacy Policy.

    Looking for Quick Drying Primers?

    Quantity
    Seller Contact Details
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice