Products / Services
  • Products / Services
  • Companies
  • Buy Leads
Post Buy Requirement

PMB Modified Bitumen

Listing ID #3826073

  • Supply Type Exporter, Supplier
  • Preferred Buyer Location All over the world

Polymer modified Bitumen Production of hot asphalt mixes with Polymer modified Bitumen (PMB) is mandatory for enhancing the performance of bitumen used in road, runway and racetrack applications both....
View More Details
Send Enquiry

Company Information

  • Member Since 10 Years
  • Nature of Business Manufacturer

Ask for more detail from the seller

Contact Supplier

Product Details no_img_icon

Polymer modified Bitumen

Production of hot asphalt mixes with Polymer modified Bitumen (PMB) is mandatory for enhancing the performance of bitumen used in road, runway and racetrack applications both by improving life expectancy and reducing maintenance levels.
There are 4 important issues for good quality PMB:
Bitumen quality, polymer compatibility (the most used polymer is SBS), mill performance (a high quality mill with high power is fundamental to grant the perfect blending of polymer and bitumen) and good agitation of the final product (which is guaranteed by two agitators in each tank).

The plant is specially designed for polymer modification of bitumen with a capacity up to 40ton/h (theoretical capacity, with 5% SBS granular polymer and bitumen temperature at 180°C) and is fitted into a containerized body for stronger structure and easy transportation.
It is very flexible and can be adapted to any jobsite thanks to its special lay-out. The batch production can vary from 1 to 6 tons, and the number of passes through the mill can vary, depending on the percentage of polymer required to modify the bitumen.

First of all we have to prepare the raw materials before the mixing process. The bitumen is heated to 170-180°C in bitumen service tanks. Bags of pre-weighed polymer are counted and placed in proximity to the feeding screw in accordance with the productions specs.
At this point, production of PMB with the modiFALT 20 plant is ready to begin.
The bitumen is pumped from service tanks to T1 or T2 (weighing & mixing tanks) via P1 (filling pump) according to required batch weight. After the minimum batch quantity has been transferred to the weighing tanks, the polymer metering systems are started up and the operator begins to load the bags into the designated hoppers.
The operator confirms via push-buttons that all the polymer has been loaded according to specs and batch quantity.
The bitumen weight is checked by the PLC control system according to specifications/batch quantity. If the polymer quantity has not been fully loaded by the operator, the PLC stops the filling operation of the P1 pump and waits for polymer confirmation. When the exact amount of polymer has been confirmed, the PLC automatically completes the tank weight to the total of bitumen + polymer. For improved disintegration of the polymer in the bitumen with the high shear mill, the polymer and bitumen mixtures have to be pumped to the mill without waiting.
When all bitumen and polymer is loaded into the tank, the PLC starts to pump out the two components via P2 (mill feeding pump) and D (high shear mill) to the PMB service tanks. The quality of the mill is essential for ensuring a high quality final product and, for this reason, a 160 kW high shear mill is advisable, which guarantees the production of modified bitumen with just a single-passage modification process (for high percentages 2 passes are recommended).
Under PLC surveillance, while P2 pumps out existing bitumen-polymer mixture, P1 fills the other tank for the next batch. These stages are automatically repeated to the end of the modified bitumen production process.
Storage: PMB blends must be stored in special PMB agitation tanks. To prevent polymer agglomeration, a stirring system is operated for 5-10 minutes every hour. To improve the stability of the blend, the tank content must be maintained at a temperature of 160-180°C.
PMB must be heated to the correct mixing temperature for the hot asphalt mix, and during asphalt production PMB should be stirred continuously by the agitators or at least kept in recirculation.

The method for establishing whether or not the polymer has been completely dissolved is the ‘stretched film’ test: un-dissolved/swollen particles appear as dark spots when a thin film of the blend is viewed with transmitting light.
The polymer has dissolved completely when there are no more physical particles of polymer present in the blend. The time required depends on the efficiency of the previous stages, the chosen bitumen and the chosen polymer grade, but is usually independent of the batch size.
The above method gives a certain indication of the results, but to be able to determine the exact mixing time, and the number of passages required through the mill, further lab testing is required, such as dynamic viscosity.



Company Details close-icon

The MARINI asphalt plant range includes:
Batch type plants, fixed, mobile and ultracompact/ultramobile plants, with production from 60 to 300 tph, depending on the site layout (Top Tower, eTOWER, Roadstar). Marini plants can be used with the most recent technologies e.g. Warm Mixes.
MARINI and the companies connected to the FAYAT Mixing Plant business unit complete the range with their continuous mix plants (MARINI-ERMONT) and cold mix plants (SAE).
MARINI is traditionally able to supply, on request, personalized versions of its standard products.
Marini production is distinguished because of the following features:
high-quality and safe-to-use components and raw materials;
superior performance level, able to satisfy the highest standard of quality and precision in compliance with the strictest environmental laws and regulations;
energy savings, sturdiness and reliability which mean cost effective results;
easy-to-use machinery with maintenance reduced to minimum, for a more rational and safe workplace;
environmental-friendly energy savings
MARINI’s products are a combination of the most modern methods of design and a vast experience acquired on work sites the world over.
The company’s philosophy is to put above all else the need to prevent and solve the real-life problems which users continuously meet in the workplace. In view of this MARINI resorts to individual, custom-made solutions.
  • Nature of Business Manufacturer / Exporter / Service Provider / Supplier
Tell us your Buy Requirement to Get Instant Response
Tell us what you need?

By clicking Get Quotes Now, I accept the T&C and Privacy Policy.

Looking for PMB Modified Bitumen?

Quantity
Seller Contact Details

Browse Related Categories

Waiting for permission
To search by voice, go to your browser settings and allow access to microphone

Allow microphone access to search with voice