Company Information
Ask for more detail from the seller
Contact SupplierType | Waste |
---|---|
Burning Capacity | 25Kgs./hr |
Combustion Efficiency | 99.9% |
Pollution Control Equipment | Cyclone Separator |
Burners | 2 Nos. provided for both chamber |
Mode of Waste Handling | Manual |
Mode Of Ash Handling | Manual |
Doors | 1 Waster charging door in primary chamber 1 ash removal door in primary chamber 1 ash removal door in cyclone separator |
Designing Calorific Value Of The Waste | 1950 Kcal/kg of Waste |
Operating Hours | (Total quantity)/ (Capacity/hr) + 1-11/2 hrs. for preheat & cooling of furnace |
Type of Fuel | HSD/DISEL |
Type Of Burner Operation | Automatic On/Off |
Connected Electrical Load | Approx 3 KW (AC3 phase, 400/440V, 50 cycle, 4 wire) |
Operating Temperature | 800 DC + 50 DC |
Primary Chamber | 1050 DC + 50 DC |
Note : Burners should be temperature controlled (TIC - Thermocouple) and work on ON/OFF basis. The frequency on ON/OFF should depend on nature of waste, moisture content, calorific value etc. |