-
Supply Type
Manufacturer, Exporter, Supplier
-
Preferred Buyer Location
All over the world
M.S. Scrap (Angle, channels, beams and sheets , Boxes,Pipes, Rods, Plates, Frames and damaged barrels, Empties etc.) Chainlink fencing in frame rusted Chainlink, M.S. Control Pannel etc. (" 1) Industrial gas cutting is allowed for easy loading. 2) Payment in Three equal installment of 20 calender days each.3) Delivery period 90 calender days without GRC & 120 calender days with GRC.