Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    EUROTECK Metal Renewable Energy System

    • MOQ1 Piece
    • Brand NameEUROTECK
    • MaterialMetal
    • System ContainsThe System Includes Sewer Pipe, Heat Exchanger, Connecting Pipes, Heat Pumps
    • Annual Maintenance ContractYes
    • UsageIndustrial
    • Supply TypeSupplier, Trader
    • Preferred Buyer Location India only
    View More Details
    Send Enquiry

    Company Information

    location Kondapur, Hyderabad, Telangana
    View Number
    • calendar Member Since 4 Years
    • building Nature of Business Manufacturer
    • gst icon GST No. 36AACCE0720C1ZE

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    • Brand NameEUROTECK
    • MaterialMetal
    • UsageIndustrial
    • Annual Maintenance ContractYes
    • System ContainsThe System Includes Sewer Pipe, Heat Exchanger, Connecting Pipes, Heat Pumps

    EUROTECK builds total energy systems with guarantees of power in kW and temperature for the need of the customer. The system includes sewer pipe, heat exchanger, connecting pipes, any type of heat pumps (electric, gas motor, absorption), peak boiler, all installations in the energy plant, control systems.

     

    In addition of this variety of opportunities to implementation, there a three new important developments:

    • The patent of an Anti-fouling-System to prevent the formation of slime (biofilm).
    • The new material developed by Arcelor-Mittal (chrome steel) provides improved thermal conductivity by about 80 percent.
    • A supervisory control system for bivalent systems with alternative energy sources.
    • We is always ahead in research and development, having invented an anti-fouling system to prevent the formation of an insulating biofilm and a new heat exchanger material with a 80 % better heat conductivity.

     

    Thanks to all these new developments it was possible to increase the heat extraction rate by up to 40%. That means, without the anti-fouling system and without the new ferritic steel, the heat exchanger chains would have to be 40% longer. Together with a bivalent process control system, sewage heat recovery plants now score with a return-on-investment of 2 – 6 years.


    Share your requirements for a quick response!
    Tell us what you need?

    By clicking Get Quotes Now, I accept the T&C and Privacy Policy.

    Looking for Renewable Energy System?

    Quantity
    Seller Contact Details
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice