Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    Industrial Water Softener

    • Supply TypeManufacturer, Exporter, Supplier, Retailer
    • Preferred Buyer Location All over the world

    The second variable in the design process is figuring out the daily demand on the system. This is calculated in gallons per minute (GPM), gallons per day (GPD), and the influent water quality. The....
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 7 Years
    • building Nature of Business Retailer

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details

    Product Details no_img_icon

    The second variable in the design process is figuring out the daily demand on the system. This is calculated in gallons per minute (GPM), gallons per day (GPD), and the influent water quality. The vessel size, pipe size, and control valve sizes are all dictated by the daily demand. A good rule of thumb is that each vessel does not regenerate more than once per day. The bed velocities need to be at an acceptable rate to minimize pressure loss and increase bed longevity. Bed velocities can range from being extremely conservative to extremely aggressive. Most designs call for bed velocities of 8 to 12 gallons per minute per square foot of bed surface area.


    Share your requirements for a quick response!
    Tell us what you need?

    By clicking Get Quotes Now, I accept the T&C and Privacy Policy.

    Looking for Industrial Water Softener?

    Quantity
    Seller Contact Details
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice