Listing ID #5383265
Company Information
Ask for more detail from the seller
Contact SupplierIn the usage stage we direct the development and establishments of site manufactured and amassed frameworks. The Engineers that have participated with us they are devoted to various undertakings that screens and controls the task plan. They are instantly performers and always get ready reports and ensure that the due dates are met on the date. Our talented designers facilitate with temporary worker groups, providers, and customers to satisfy their prerequisites and keep up maintain assignment costs.
1. Temperature and Humidity Test
2. Recovery Test
3. Containment Test
4. Air Exchange Rate
5. Noise Level Test
6. Light Intensity Test
7. Room Pressurization Test
8. Particle Count Test
9. DOP/PAO HEPA Filter Integrity Test
10. Air Velocity Measurement
11. Airflow Visualization Test