Products / Services
  • Products / Services
  • Companies
  • Buy Leads
Post Buy Requirement

Heat Transfer Through Lagged Pipe

Listing ID #4361347

  • Supply Type Manufacturer, Exporter, Supplier
  • Preferred Buyer Location All over the world

The setup is designed and fabricated to study lagging phenomenon in case of pipes. It consists of three concentric pipes of small thickness as compared to diameter and are arranged concentrically,....
View More Details
Send Enquiry

Company Information

  • Member Since 12 Years
  • Nature of Business Retailer
  • Year of Establishment 1999

Ask for more detail from the seller

Contact Supplier

Product Details no_img_icon

The setup is designed and fabricated to study lagging phenomenon in case of pipes. It consists of three concentric pipes of small thickness as compared to diameter and are arranged concentrically, and closed with the help of two discs. Two different insulating materials fill the annuli between the cylinders compactly. Temperature Sensors are fitted to measure the temperature of pipe walls for radial outward heat flow measurement. Inside the inner pipe, a Nichrome wire heater is placed axially. Heat input to the heater is given through a variac and measured by Digital Voltmeter and Digital Ammeter. By varying the heat-input rates, wide range of experiments can be performed

Experiments

  • To estimate the actual rate of heat transfer through the composite cylinders from the measured interface temperature of the known value of thermal conductivity of the two insulating materials.
  • To determine the effective thermal conductivity of the composite cylinders
  • To determine the theoretical temperature profile within the composite cylinders

Utilities Required

  • Electricity Supply: 1Phase, 220 V AC, 2 Amp.
  • Table for set-up support


Company Details close-icon

Engineering Laboratory Equipments was incorporated in the year 1999 with an aspiration to set new heights in the dome of manufacturing Engineering Equipment. With the help of our dedicated staff, we have positioned ourselves as one of the most outstanding Engineering Instruments Manufacturers in India.
  • Nature of Business Manufacturer / Exporter / Supplier / Retailer
  • Number of Employees 20 - 50
  • Year of Establishment 1999
Tell us your Buy Requirement to Get Instant Response
Tell us what you need?

Looking for Heat Transfer Through Lagged Pipe?

Quantity
Seller Contact Details

Browse Related Categories

Waiting for permission
To search by voice, go to your browser settings and allow access to microphone

Allow microphone access to search with voice
Heat Transfer Through Lagged Pipe at Best Price in Ambala - ID: 4361347
Products / Services
  • Products / Services
  • Companies
  • Buy Leads
Post Buy Requirement

Heat Transfer Through Lagged Pipe

Listing ID #4361347

  • Supply Type Manufacturer, Exporter, Supplier
  • Preferred Buyer Location All over the world

The setup is designed and fabricated to study lagging phenomenon in case of pipes. It consists of three concentric pipes of small thickness as compared to diameter and are arranged concentrically,....
View More Details
Send Enquiry

Company Information

  • Member Since 12 Years
  • Nature of Business Retailer
  • Year of Establishment 1999

Ask for more detail from the seller

Contact Supplier

Product Details no_img_icon

The setup is designed and fabricated to study lagging phenomenon in case of pipes. It consists of three concentric pipes of small thickness as compared to diameter and are arranged concentrically, and closed with the help of two discs. Two different insulating materials fill the annuli between the cylinders compactly. Temperature Sensors are fitted to measure the temperature of pipe walls for radial outward heat flow measurement. Inside the inner pipe, a Nichrome wire heater is placed axially. Heat input to the heater is given through a variac and measured by Digital Voltmeter and Digital Ammeter. By varying the heat-input rates, wide range of experiments can be performed

Experiments

  • To estimate the actual rate of heat transfer through the composite cylinders from the measured interface temperature of the known value of thermal conductivity of the two insulating materials.
  • To determine the effective thermal conductivity of the composite cylinders
  • To determine the theoretical temperature profile within the composite cylinders

Utilities Required

  • Electricity Supply: 1Phase, 220 V AC, 2 Amp.
  • Table for set-up support


Company Details close-icon

Engineering Laboratory Equipments was incorporated in the year 1999 with an aspiration to set new heights in the dome of manufacturing Engineering Equipment. With the help of our dedicated staff, we have positioned ourselves as one of the most outstanding Engineering Instruments Manufacturers in India.
  • Nature of Business Manufacturer / Exporter / Supplier / Retailer
  • Number of Employees 20 - 50
  • Year of Establishment 1999
Tell us your Buy Requirement to Get Instant Response
Tell us what you need?

By clicking Get Quotes Now, I accept the T&C and Privacy Policy.

Looking for Heat Transfer Through Lagged Pipe?

Quantity
Seller Contact Details

Browse Related Categories

Waiting for permission
To search by voice, go to your browser settings and allow access to microphone

Allow microphone access to search with voice