Gas Cylinder Manifold System, we offer, consists of a main gas delivery bank and a reserve bank of cylinders. When the primary cylinder bank is depleted, manually turn off the valve on the primary bank and open the valve on the reserve bank to reactivate gas flow. The changeover of this system needs to be operated manually. Features
Open-style manifold
Brazing / SS welding on piping joints for maximum leak prevention
System is designed to accomodate future expansion needs
Headers have been tested to withstand high cylinder pressure
Wall or floor mount available