Contact SupplierThe Electronic Static Weigh-bridge is made up of a framework of girders adequately reinforced with transverse beams and suitable non-slip top deck with Pit less & Pit type Structure. The entire steel framework is mounted on strain gauge double ended shear beam / Compression Type Load Cells (4, 6, & 8 No's. Load Cells), depending on length of the platform. The shear stress produced by the load is detected by a strain gauge, full bridge circuit and converted into an analog electrical signal. Signal from each loadcell is fed to Junction Box. Output from Junction Box is fed to microprocessor based weighbridge Microprocessor based weighbridge Intelligent Terminal. The processing electronics of terminal digitizers the signal from the Junction-box using an ADC, based on time proven quad slope integration technique and weight is registered on LED display.
Model | Capacity | Accuracy | Platform Size |
AIR 03T | 03 TON | 0.5 Kg. | 6 x 6 ft |
AIR 06T | 06 TON | 1 Kg. | 12 x 8 ft |
AIR 10T | 10 TON | 2 Kg. | 16 x 8 ft |
AIR 20T | 20 TON | 5 Kg. | 6 x 3 Mtr |
AIR 30T | 30 TON | 5 Kg. | 7.5 x 3 Mtr |
AIR 40T | 40 TON | 5 Kg. | 7.5 x 3 Mtr |
AIR 40T | 40 TON | 5 Kg. | 9 x 3 Mtr |
AIR 40T | 40 TON | 5 Kg. | 12 x 3 Mtr |
AIR 50T | 40 TON | 10 Kg. | 9 x 3 Mtr |
AIR 50T | 50 TON | 10 Kg. | 15 x 3 Mtr |
AIR 60T | 50 TON | 10 Kg. | 9 x 3 Mtr |
AIR 60T | 60 TON | 10 Kg. | 16 x 3 Mtr |
AIR 60T | 60 TON | 10 Kg. | 18 x 3 Mtr |
AIR 80T | 60 TON | 20 Kg. | 18 x 3 Mtr |
AIR 100T | 100 TON | 20 Kg. | 18 x 3 Mtr |
AIR 100T | 100 TON | 20 Kg. | 20 x 3 Mtr |
Diffrence Between Pit Type And Pitless Type Electronic Weighbridge.
Pit | Pitless | |
Cost | More expensive due to additional construction work required | Less expensive due to less construction work |
Service and scale repairs | In some cases, more costly due to confined area restrictions | Less Difficult or costly and serviced from above |
Clean Out | Done manually and very time consuming | Quick and easy, done with a water hose or compressor from the side |
Scale Inspection | Must be performed from inside the pit | Can be performed by simply walking around the perimeter of the scale |
Restrictions or hazards | Some states require specified clearances underneath scale. Must also deal with OSHA and confined space hazards regulations. | Some states require specified clearances underneath scale |
Approaches | 10' flat and level | 10' flat and level |
Ramps | None | Typically 25' long on each end of the ramp. requires more real estate to install and operate |
Electricity Needed | Must have electricity for pit lights and sump pump if no gravity drain is present | None |