The Furnace operate around 16 to 18 hours a day, capacity can be vary from 250 Kg to 30 Ton per batch.The Operational time cycle in forging furnace is divided into Heat up Time, Soaking Time and Forging Time.The Consumption of fuel depends upon type of feed and number of reheat required.With Newly VENEERING INSULATION TECHNOLOGY it possible to reduce fuel consumption up to 50 % and increases the refractory life and production rate with faster start up heating time with low capital investment.