Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    ERW Welded Pipes

    • Supply TypeManufacturer, Supplier, Retailer
    • Preferred Buyer Location All over the world

    We are reckoned as the prime Manufacturer, Exporter, and Supplier of the efficient ERW Welded Pipes in India. Duly tested for their strength and other such factors, our ERW Welded Pipes are popular....
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 17 Years
    • building Nature of Business Retailer
    • Year of Establishment 1978

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    We are reckoned as the prime Manufacturer, Exporter, and Supplier of the efficient ERW Welded Pipes in India. Duly tested for their strength and other such factors, our ERW Welded Pipes are popular for their performance in the worldwide markets. The range of ERW Welded Pipes is available at affordable prices with us. Size Range :
    • From 3â diameter to 10â diameter
    Conforms To
    • API-5L
    • PSL-1
    • PSL-2
    Grades
    • A
    • B
    • X-42
    • X-46
    • X-52
    Applications
    • Air, steam, oil & gas transmission
    • Structural purposes
    • Idlers / conveyors
    • Automotive purposes
    • Scaffolds
    • Water wells (casing pipes)
    • Water, gas & sewage pipes
    • Electric poles
    Manufacturing Process
    • Step â 1 Material received from SAIL / ESSAR Steel Ltd. / Lloyds / ISPAT or other any approved vendor. The steel shall be fully conformed to the API 5L / IS Standard Specification or as per Customerâs Specification. Testing/ Checking and Identification of Raw material shall be done as per API 5L / IS Standard Specification.
    • Step â 2Edge Preparation & Milling Edges of Coil / Skelp are form in edge breaking unit at initial stage so that perfect forming is achieved at welding area. Strip edges are given mill cut on both sides with edge milling machine to make the edges clean and square for perfect butt welding with high frequency. It shall be done before passing the strip to forming process.
    • Step â 3Forming of Pipe Strip is passed in number of horizontal rolls after edge breaking and form cages supported by vertical rolls to receive an open edge round tube before welding. At the final stage of forming, rolls are provided with guide fins to have a proper proportionate gap and correct entry in welding roll.
    • Step â 4High Frequency Welding Finally the pipe shape performed after forming process, it passed through welding heads followed by the seam guide. The process of welding is based on ERW process. Electric welding shall be performed with a minimum welder frequency of 200 KHz. The fusion takes place through a roll assembly set for proper welding. Bead trimming shall be done as per API 5L / IS Standard or as per Customer Specification.
    • Step â 5Seam Normalizing Normalizing is carried out on weld and HAZ after welding at the temperature of 8500 C to 9000 C. The temperature of seam normalizing is monitored by a non contact indicator having the digital display along with recorder. Equipment: Seam Normalizer Capacity : 500 KW.
    • Step â 6Sizing A set of sizing roll is ahead of cooling zone, water cooled pipe is passed through sizing rolls which control the Ovality and required dimensions, which is finally verified with measuring instruments as specified in relevant Specification.
    • Step â 7NDT Testing (Eddy Current) Eddy current testing is the process of inducing small electrical currents in an electrically conductive article and observing the resultant reaction between the magnetic fields involved. Equipment: Eddy Current Flaw Detector (PC based).
    • Step â 8Finishing of the Pipes Finished pipe are cut to required length by cut of carriage. Thereafter both ends of pipes are beveled by the end facer. Finally each pipe are checked for its Outer diameter, Inner Diameter, Thickness, Straightness, and length.
    • Step â 9Hydro Testing After completing all the above process, all pipes transferred to the hydro testing bench. The test pressure shall be given to the pipes as per relevant specification or as per Customer Requirement.
    • Step â 10Galvanizing Process Hydro Test passed pipes are send for Hot Dip Galvanizing confirming to various Indian Standard / International Standard.
    • Step â 11Marking Marking on the pipes shall be paint stenciled as stipulated in API 5L/ IS Standard or as per the customerâs requirement, on each length of the pipe.


    Share your requirements for a quick response!
    Tell us what you need?

    By clicking Get Quotes Now, I accept the T&C and Privacy Policy.

    Looking for ERW Welded Pipes?

    Quantity
    Seller Contact Details
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice