Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    DG Synchronization Panel

    • TypeFixed , drawout ,compartmentalized ,dust & vermin proof
    • RATED CURRENTUpto 6000A main busbar rating
    • BUS CHAMBERAir cooled with louvers
    • SHORT CIRCUIT LEVEL35 KA / 50 KA /70KA for 1 sec
    • Supply TypeManufacturer, Exporter, Supplier, Retailer
    • Preferred Buyer Location All over the world
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 7 Years
    • building Nature of Business Retailer

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    • TypeFixed , drawout ,compartmentalized ,dust & vermin proof
    • BUS CHAMBERAir cooled with louvers
    • BUSBARAluminium / Copper, Electrolytic grade
    • SHORT CIRCUIT LEVEL35 KA / 50 KA /70KA for 1 sec
    • RATED VOLTAGEStd. 415 / 440 V, 50 HZ, 3 phase, 4 wire
    • STANDARDIS 8623
    • RATED CURRENTUpto 6000A main busbar rating
    • SYNCHRONIZINGAuto changeover & transfer . Auto Synchronizing/parelleling of DG sets Auto loads sharing (KW/KVAR) Load dependent start stop
    • CABLE ALLEYAmple space for cabling with supports
    • PROTECTION CLASSIP42 / IP 54 – Optional
    • CABLE ENTRYTop or Bottom
    • BUSBAR SUPPORTSMC/DMC, Epoxy.
    • ENCLOSURE TYPEIndoor / Outdoor

    We are the pioneers in introducing PLC based DG synchronization panels to the Electrical panel industry in northern region .With years of experience and on site troubleshooting/diagnosis capabilities we have designed our DG synchronization panel with great care , consider ing the protection of DG sets and associated switchgear for optimum workability .
    It is used to supply DG set power in absence of main power. It comprises of control of DG set as well as switching of breakers. In absence of main source it starts the first DG set & synchronizes with the second DG set automatically along with auto load(KW/KVAR) sharing , the same procedure is followed with balance DG sets as per load demand . The DG sets are switched ON & OFF as per the load requirement . On restoration of Grid Power , DG ACB’s are tripped and Load is transferred to Grid power. DG sets remain in running condition for a specific cooling time as specificed by generator manufacturer and subsequently DG sets are shutdown.



    Interested in this product? Ask for more details & Latest Price from seller
    Send Enquiry
    Share your requirements for a quick response!
    Tell us what you need?

    By clicking Get Quotes Now, I accept the T&C and Privacy Policy.

    Looking for DG Synchronization Panel?

    Quantity
    Seller Contact Details
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice