Company Information
Ask for more detail from the seller
Contact SupplierWe are the pioneers in introducing PLC based DG synchronization panels to the Electrical panel industry in northern region .With years of experience and on site troubleshooting/diagnosis capabilities we have designed our DG synchronization panel with great care , consider ing the protection of DG sets and associated switchgear for optimum workability .
It is used to supply DG set power in absence of main power. It comprises of control of DG set as well as switching of breakers. In absence of main source it starts the first DG set & synchronizes with the second DG set automatically along with auto load(KW/KVAR) sharing , the same procedure is followed with balance DG sets as per load demand . The DG sets are switched ON & OFF as per the load requirement . On restoration of Grid Power , DG ACB’s are tripped and Load is transferred to Grid power. DG sets remain in running condition for a specific cooling time as specificed by generator manufacturer and subsequently DG sets are shutdown.