Listing ID #3882430
Company Information
Ask for more detail from the seller
Contact SupplierAfter blow-drying the coated pieces are required to be cured in an air circulatory oven. The articles are required to be cured at 160 Deg. C for 20 minutes. The pieces may be either loaded on the Trolleys for convenient handling or loaded in the Oven in any suitable manner.