The construction and commision of industrial projects is completed phase wise. Hence, manufacturing units and pipelines are kept ready for commissioning before connection to the circuit or system.Hydrotesting of these assets such as boilers and pipelines is carried out before commissioning to ensure that there are no leakages in the system and water from rivers, irrigation canals and wells is used as available.