Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    Central Medical Gas Pipeline Systems

    • MOQ1 Set(s)
    • Supply TypeManufacturer, Exporter, Supplier
    • Preferred Buyer Location All over the world

    A) Manifold Shall Consist of Two High-pressure Header Bar Assemblies to Facilitate Connection of Primary and Secondary Cylinder Supplies. Each Header Bar Shall Be Provided with ------ Numbers(....
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 16 Years
    • building Nature of Business Manufacturer
    • gst icon GST No. 27AHCPM7396J1ZR

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    A) Manifold Shall Consist of Two High-pressure Header Bar Assemblies to Facilitate Connection of Primary and Secondary Cylinder Supplies. Each Header Bar Shall Be Provided with ------ Numbers( as per Hospital Requirement) of Cylinder Pigtail Connections to Suit Cylinder Valves as per is 3224 Incorporating a Check Valve At the Header Connection. Manifold Should Be Suitable to Withstand a Pressure of 150 Kg/cm2, Along with High Pressure Copper Annealed Tail Pipes with End Brass Adapter Suitable for Cylinders and Manifold. the High-pressure Header Bar Shall Be Designed in such a Manner that It Can Be Extended to Facilitate Additional Cylinder Connections. Each Header Bar Assembly Shall Be Provided with a High-pressure Shut-off Valve. Top Frame Comprising of High Pressure Copper Pipes of Size 1/2” I.d. X 15swg with High Pressure Brass Fittings Made of High Tensile Brass and Connections Through Non- Return Valves ; High Pressure Copper Tail Pipes, Made of High Pressure Copper Pipe of Size 1/4” I.d. X 15 Swg.
    b) the Manifold Should Be So Designed that It Shall Suit Easy Cylinder Changing and Positioning.
    c) the Middle and Bottom Frame to Be Provided to Fit Both Round and Flat Bottom Cylinders Safely.


    Additional Information

    • Packaging DetailsOctri at actual, packing, forwarding, fright charges extra.
    • Delivery Time1 to 2 weeks
    Share your requirements for a quick response!
    Tell us what you need?

    By clicking Get Quotes Now, I accept the T&C and Privacy Policy.

    Looking for Central Medical Gas Pipeline Systems?

    Quantity
    Seller Contact Details
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice