A 34 MW CPP has been set up for power generation from waste heat coming out from the DRI plants and solid waste coming from coal washery and DRI plants. The 34 MW captive power plant is generating 12 MW electricity using waste heat from Adhunik's DRI plant and balance 22 MW solid waste from the DRI plant and coal washery.