HORIZONTAL 3 PASS Wood / Briquette Fired Package Boiler (Wet Back Design )having an evaporation capacity of 2000 kgs/hr of steam from and at 100°C with working pressure of 10.54 kg/Sq.cm (150 PSI) along with standard Boiler mountings & fittings.
STANDARD BOILER MOUNTINGS & FITTINGS:MAKES
a) Main steam stop valve:1 No.ELEMS / CARONA
b) Steam Safety Valve:2 No.BRITECH / EQU
c) Water level gauge with protectors:2 Sets LEVCON / RUSHAS
d) Accessible feed check valve:2 No.ELEMS / CARONA
e) Blow down valve:1 No. LEVCON
f) Fusible plug:1 No. ELEMS
g) Pressure gauge with siphon:1 No.H GURU / GLUCK
h) Air vent valve:1 No.ELEMS
i) Pressure Switch:1 No.INDFOSS
PUMPING ARRANGEMENT:Â
�PAINTINGS AND REFRACTORY: To minimize radiation units are protected with Boiler heatproof paint inside and outside. Painted in attractive colors.� Return chamber are caste with special heat resistive refectory of ACC super crate cement which minimizes radiation� losses.
LADDER PLATFORM & COVER :Â Main boiler is mounted on strong and studyÂ
chair, Ladder and platform are provided for easy accesses to valves & mounting on
boiler.� Our unique constructions helps fast installation at site, needs negligible
foundation.� Required number of mud holes and a large size elliptical manhole is also
provided for easy cleaning operation.
DRAUGHT FAN: One No. ID FAN of suitable capacity Mounted on a base frame along� with Pulley, V Belt coupled with suitable motor shall be supplied alongwith the Boiler, Designed for 1440 RPM.
One No. FD Fan of suitable capacity directly Coupled with suitable motor shall beÂ
supplied alongwith the Boiler.
CONTROL PANEL : One No. Electrical control panel with contactors, switches, starters, HRC fuses, relays, terminals, along with push button switch, pilot lamps, Rotary ON/OFF switch etc, for convenient operation.
WATER LEVEL CONTROL SYSTEMÂ :One Water level control system (Mobrey control) side to side entry to regulate high/low water level controls to the boiler
CONSTRUCTION:
The Boiler offered as above, will be designed and manufactured by us as per INDIAN BOILER REGULATIONS -1950 ISOR - 831 with latest amendments. Strict quality control is maintained throughout the construction of the Boiler. A complete set of drawings and documents certified by the Inspecting authority of the State of its origin will be furnished by us within three to� four� weeks from the date of dispatch of the boiler.
Â
Â
Note: the offer Excludes supply of Chimney , civil works & any air or flue gas ducting.
Â