Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    Brick Bat Waterproofing Services

    • Business TypeService Provider
    • Preferred Buyer Location All over the world

    Procedure for brickbat waterproofing starts with cleaning the surface with hard material and filling cracks if there are any. Above the clean surface, 2 base coats of waterproofing chemicals are given. Then a 3-4 inch layer of bricks layer is laid on that surface. And the surface is filled with concrete mixture. The mixture is filled in such a way that the surface will have a slope at one side so that water won’t accumulate on the surface and will drain out. And after the drying surface is covered by two coats of waterproofing chemicals.
    Send Enquiry

    Company Information

    • calendar Member Since 6 Years
    • building Nature of Business Service Provider
    • Year of Establishment 2011

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    Share your requirements for a quick response!
    Tell us what you need?

    By clicking Get Quotes Now, I accept the T&C and Privacy Policy.

    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice