Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    Furan Cement, Color : Black

    • ColorBlack
    • ProductAcid Resistant FURAN Cement
    • Final Setting Time Min at 27°C+ 2°C(mins.)10 to 12 hrs
    • Ratio :- Powder : Solution3 : 1
    • Supply TypeManufacturer, Exporter, Supplier, Retailer
    • Preferred Buyer Location All over the world
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 7 Years
    • building Nature of Business Retailer

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    • ColorBlack
    • ProductAcid Resistant FURAN Cement
    • Initial Time. Min at 27°C+ 2°C(mins.)6 hrs
    • Final Setting Time Min at 27°C+ 2°C(mins.)10 to 12 hrs
    • Self Life @ 27°C **2 month
    • Bond Strength (kg/cm2)10
    • Flexural Strength (kg/cm2)75
    • Temperature Resistant (Max °C)170
    • Ratio :- Powder : Solution3 : 1
    • Working time. Min at 27°C+ 2°C(mins.)20 mins
    • Water Absorption (Max %)01
    • Compressive Strength (kg/cm2)350

    Acid Resistant FURAN Cement

    DATA SHEET OF Acid Resistant FURAN Cement.

    It

    is a Furan Resin base cement

     

    Furan is an impermeable cement is a chemical resisting cement with great resistance to a
    wide diversity of cement of chemical compounds including acids, alkalis, oils, Brines, Solvents etc.

     
     

    Acid Resistant FURAN Cement can be use in laying and pointing of acid proof brick and tiles, Mandana stone 
    construction of Acid resistance tank flooring it is also use in pipe jointing materials.

     


    Application

     

    Dyes & Intermediates, Chemical Process Industries, Steel Plant., Dairy Food & Beverages Plants, Tubing Manufacturing Plant, Electrolyzing Plants, Oil Refineries, Rayon Industries , Pulp & Paper Mills, and many others applications.

     

    The setting of Acid Resistant FURAN Cement is affected by change in atmosphere & temperatures and becomes very slow when the tempreture low. This could be overcome by keeping the site warm with heaters. The Solution may be placed near warm places, the mixing could be done in warm place, the bricks may be stacked in checkered fashion, around fire or steam coil.

     

     



    Interested in this product? Ask for more details & Latest Price from seller
    Send Enquiry
    Share your requirements for a quick response!
    Tell us what you need?

    By clicking Get Quotes Now, I accept the T&C and Privacy Policy.

    Looking for Furan Cement?

    Quantity
    Seller Contact Details
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice