Listing ID #2045272
Company Information
Ask for more detail from the seller
Contact SupplierWe are offering 6 mw 43 kg (2000) make, bagasse fired power plant.
boiler details:
make : thermodyne
year : 2000
heating surface area: 1856m2
super heater outlet temp. 440oc. Coil type primary &
secondary super heaters ã�â¢ã¯â¿â½ã¯â¿â½ 158.0m2
economiser : coil type economizer ã�â¢ã¯â¿â½ã¯â¿â½ 387.2m2
air heater : 1200m2 ã�â¢ã¯â¿â½ã¯â¿â½ heating surface
f.d. Fan : 14.5m3sec., 230 mm of water
i.d. Fan : 32.4m3sec., 300 mm of water
s.a. Fan : 4.3m3sec., 770 mm of water
feed water storage tank: 60m3
deareater with tank : 60m3
feed pumps : 2 nos. , type had 6511, make:ksb
d.m. Plant : capacity-360m3day, 15 thr.
single tank ã�â¢ã¯â¿â½ã¯â¿â½ 75m3 storage
turbine details:
make: belliss india ltd
type: hen -22
inlet pressure: 44 kgcm2
progressive no.: bm4557b
output: 6000 kw (bhp)
year: 2000
inlet temp.: 420oc.
exhaust pressure: vacuum at 0.12 ata
speed: 8500 rpm
extraction pressure: 7.0 kgcm2 (bleed)
bleedextraction qty.: 11.0 tph
quantity of steam sent to condenser ã�â¢ã¯â¿â½ã¯â¿â½ 24 to 30 tph
gear box details:
make: triveni s.no.: 00023
model no.: 0560x, gear ratio ã�â¢ã¯â¿â½ã¯â¿â½ 5.76
year: 2000;
power ã�â¢ã¯â¿â½ã¯â¿â½ 6000 kw
input speed: 8600 rpm
output speed: 1500 rpm
type: double helical
no.of teeth: 16429, service factor ã�â¢ã¯â¿â½ã¯â¿â½ 1.7
alternator details:
make: toyo denki japan ã�â¢ã¯â¿â½ã¯â¿â½ by kirloskar elec.co.ltd
year : 2000
speed : 1500 rpm
cooling arrangement :air cooled ã�â¢ã¯â¿â½ã¯â¿â½ air is cooled by cooling tower water circulation.
note :
the boiler is using bagasse as fuel. The boiler has dumping type furnace grate. From bagasse yard, bagasse is shifted with the help of belt conveyor. In between bail breaker is installed. Then bagasse goes to boiler through r.b.c. (rear bagasse carrier) & bagasse elevator. Finally, bagasse is fired to the boiler with pneumatic bagasse spreader, i.e. With the help of s.a. Air pressure.
price inrs. 80000000-
apart from this the buyer has to pay us a service commission of 2 % plus the expenses incurred in the dealing process (site inspection, any expert requirement, arranging meeting with owners etc.) the cost of dismantling, applicable taxes, loading, transportshipping, insurance etc shall be borne by the buyer in addition.