Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    Ash Handling Systems

    • Supply TypeManufacturer, Exporter, Supplier, Retailer
    • Preferred Buyer Location All over the world

    The conveying rate achieved is 30 - 32 Tons per hour. When cement fly ash is received at site in Bags, then they are manually taken to a hopper. Bags are slit and loose material is dumped in to the hopper. A specially, designed screw feeder and low pressure air insertion ensures measured flow of material in to the discharge pipe line The cement fly ash dropped in discharge pipe are pushed ahead to main silo with the pressure of 1 KgCm2. The transfer rate achieved is 12 to 15 Tons Hour forthis mode The same operational procedures remain common for lime handling systems also.
    Send Enquiry

    Company Information

    • calendar Member Since 16 Years
    • building Nature of Business Retailer

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    Share your requirements for a quick response!
    Tell us what you need?

    By clicking Get Quotes Now, I accept the T&C and Privacy Policy.

    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice