Welcome to Ms Dcm Engineering Ltd.
The DCM group set up a Grey Iron Foundry in 1977 with a capacity of 17000 MTPA (Metric Tons Per Annum) as Division of DCM Engineering,which is a division of DCM Limited. Capacity of this foundry was increased to 35,000 & 50,000 MTPA in the year.. Read More