Our Products
Electromagnet
2 Products availableMaterial Handling Machines & Systems
1 Products availableSteel & Steel Products
1 Products availableFerrous & Non Ferrous Metal Scrap
1 Products availableMagnetic Separators
1 Products availablePollution Control Machines & Devices
1 Products availableMagnet
1 Products availableWe offer a complete product range of permanent magnet lifter
The MULE is specially designed and manufactured to cater for handling large quantities of scrap. The increasing size of arc and induction furnaces necessitate large requirements of handling scrap, especially unloading from the incoming vehicles as well as feeding the furnace platform or charging baskets. The MULE is specially designed in an elliptical shape to enable entry into restricted spaces, and at the same time carry away high loads |
1) A main Hopper of suitable capacity fitted with unbalanced Motorised Vibrator Feeder Tray with 0.5 KW 1440 RPM 02 Nos. Vibrator Motor, with Variable Vibration arrangement.
2) Bottom support is with gusset plate. We provide 4 Nos. foundation supports of steel plates so that the complete Permanent Magnetic Concentrator can rest on flat earth, or any platform / structure.
Body
The Permanent Magnet body has been designed to provide the most efficient magnetic circuit, whilst keeping the magnet weight to the minimum, without loss of performance making this the ideal range of magnets. The magnet body is fabricated from high permeability low carbon steel for minimum leakage and maximum magnetic lifting efficiency.
Side Covers
12 S.W.G. M.S Sheet will be bolted with a main body. Inspection windows have been provided for maintenance.
The Slag Crusher and Separator are light weight as compared to other crushers in the market and can be conveniently shifted where ever required. The Slag Crusher and Separator do not require any expensive concrete foundation
|
Recycling is today concern as every penny saved is penny earned.For a 10 Ton Induction furnace producing around 100 TPD, the slag generation is around 6% to 10% of total production depending on the quality and type of scrap. Say 6% of slag, that is 6T of slag is generated per day, monthly generation of slag with an average of 26 working days is 168 Tons. per month.
As per our experiments and finding through visits to various steel plants around the country there is 5% to 6% steel content in the slag after manually retrieving visible steel scrap from the slag 6% of 168 Ton of Slag generation is 10T and the cost of Steel Scrap recovered @ Rs17/- per Kg is Rs.1, 70, 000/- per month.
For an Induction Furnace of Capacity 10T per batch.
Production Per day | - | 100 TPD* |
Slag generation @ 6 % | - | 6 TPD* |
Slag generated per month. | - | 168 TPM+ |
5% Steel Scrap Retrieved from Slag | - | 10 TPM+ |
* TPD = Tons Per Day+ TPM = Tons Per Month