-
Min. Order (MOQ)
10 Piece(s)
-
Type
GRAPHITE CRUCIBLE faridabad
-
Brand Name
GRAPHITE CRUCIBLE faridabad
-
Application
GRAPHITE CRUCIBLE faridabad
-
Chemical Composition
graphite
-
Dimension
GRAPHITE product faridabad
-
Country of Origin
faridabad
-
Model Number
GRAPHITE CRUCIBLE faridabad
-
black
grey
We are offering graphite crucible india. In our products line we graphite carbon india faridabad are offering a range of graphite crucibles. Customers can also graphite crucible collar type, graphite crucible - bottom pouring, metro furnace graphite crucibles, graphite crucible boat and bottom pouring graphite crucible. This whole range of products is manufactured with only durable and standard and raw material which are sourced from noteworthy vendor organizations of the industry. We also check the crucibles on the base of several parameters. 1). Graphite crucibles crucibles the range of graphite crucibles manufactured by graphite carbon india faridabad and supplied by us is made of pure raw material sourced from very trusted vendor base. Used in various industries, our crucibles is also analyzed on the basis of various internationally recommended parameters. After manufacturing this array of products, we store the crucibles in the state-of-the-art warehousing unit with utmost care and safety. graphite carbon india faridabad manufacturing plant offers graphite crucibles can withstand the high temperature, and has good resistance to chemical erosion and thermal shock. Especially graphite crucible is ideal for the melting of aluminum, copper and other metals like gold and silver. Features: we offer graphite crucibles for varied purposeshigh density graphite crucibles are utilized in vacuuminert atmosphere furnacesbest suited crucibles for quality melting specifications: length: 25 mm-500 mmid: 12 mm-350 mmod: 25 mm-500 mmcapacity: 250 gms to 50 kgs available in: grade-igrade-ii (fine)grade-iii (normal)
Additional Information:
Payment Terms :
L/C, T/T, Western Union
Packaging Details : in wodden box
Delivery Time : 07 days