Our Products
Effluent Treatment Plant
2 Products availableChemical Machinery & Plant
1 Products availableIndustrial Chimney
1 Products availableChimneys
1 Products availablePlant Maintenance Service
1 Products availableWaste Management & Pollution Control Services
1 Products availableIn such grim situation one has to really start thinking a fresh on various profit making avenues which were being ignored in better times. The ideal way of looking at it is basically looking at points to save wastages of various resources and recover it profitably wherever possible.
Details :Braj Projects Pvt.Ltd. has a team who have an experience of More then 10 Years in recovery from waste offering various projects such as heat recovery systems , salt recovery and caustic recovery system / caustic recovery plant
Explanation :Mercerisers for Textile Mills generate dilute caustic liquor, which if drained to effluent treatment plant, will create considerable problems in meeting the environmental standards. Caustic recovery system / caustic soda recovery plant by concentrating wash liquor and using the same back in Merceriser is the only feasible solution.
Principle :Under caustic recovery system / caustic soda recovery , Caustic at low concentration is heated to its boiling point with the help of a heat source and the vapors generated due to boiling are used to heat the weak liquor. This hot liquid is then flashed at lower pressure and the vapors so generated used again. The weak liquor is concentrated to 250-300 GPL as in case of dry Merceriser or 450-500 GPL in case of wet Merceriser which can be reused with a minor topping up of caustic.
Operation :
Power Saving System saves energy for gas discharge lamps like tube light, sodium vapor lamp, mercury vapor lamp, metal halide lamps, etc without altering existing fittings. This is achieved by our Magnetic Amplifier coils and is fitted before MLDB. We are enlisted among the reputed Manufacturers, Exporters and Suppliers of Power Saving System. The manufacturing and testing of our Power Saving System are done under the strict vigilance of experts. Benefits :
Advantages :
Braj Projects Pvt.Ltd., every plant is tailor – designed to suit various process conditions like; Feed Temp, Feed Concentration, Product Concentration and Characteristics of Material like Heat Sensitivity, Flow Characteristics, Corrosion & Scaling tendencies.
Details :
Post Evaporation Drying :Based on the available infrastructure and the pollution norms various Post evaporation methods are employed by industries are as follows :
Additional Information:
Payment Terms : T/T,
Delivery Time : 2 weeks
Rcc-Chimney Benefits:
We construct RCC Chimneys for Process Industries like Paper, textiles, Sugar, Ethanol, Rice mills, Chemicals, Pharmaceuticals , Steel etc.
Steam Turbine works on revolutionary concept with a view to keep the cost to minimum. It has three different modules integrated to generate electrical power namely Turbine, Gearbox and Generator. Apart from this, oil pumps, oil cooler and oil filters are also the part of Steam Turbine. We are named among the renowned Manufacturers, Exporters and Suppliers of Steam Turbine. We manufacture Steam Turbine using quality approved components and advanced technology at our well-equipped production unit. Features :
Price Range : Ranging from Rs. 5 Lakhs to 2 Crore
Additional Information:
Payment Terms : L/C
Delivery Time : 90 dAYS
Technical Specifications
Models | 550B | MS 400-B | MS 660-EB/EC |
---|---|---|---|
Power level | 75 ~ 250 kW | 300 ~ 500 kW | 750kW ~ 3.0 MW |
Turbine type | Single stage impulse/2- row Curtis | Multi-stage impulse | Multi-stage impulse |
Turbine speed - RPM | 5300 | 7500 | 6000 |
Application | Mechanical drive/Power generation | Mechanical drive/Power generation | Mechanical drive/Power generation |
Inlet steam pr./temp. | Upto 42 kg/cm2g, 430 deg C | Upto 42 kg/cm2g, 430 deg C | Upto 42 kg/cm2g, 430 deg C |
Extraction pr. | - | - | Upto 17Kg/cm2g |
Back pr. | Upto 8.0 Kg/cm2g | Upto 8.0 Kg/cm2g | Upto 8.0 Kg/cm2g in BP and 0.1 Ata in cond. Mode |
Turbine | Nozzle Chest | One set of main nozzles and two hand valves for multiple admission, Operational flexibility and optimal efficiency. |
Nozzle & guide vanes | Aerodynamically designed airfoils for max. Efficiency. | |
Turbine Blades | Latest profiles for high efficiency | |
Turbine Discs | Forged steel with inserted blades, shrouded and machined for minimum tip leakage losses. | |
Bearings | Hydrodynamically designed Journal and Journal cum Thurst bearings, white metal lined | |
Seals 1 | Steam Side - Split Carbon Rings Oil Side - Phosphor bronze Labyrinth | |
Governor 2 | Hydro-mechanical, Woodward or equivalent for Island mode operation. | |
Governing valve | Combined throttle cum stop valve for governing and quick shut-off, built in strainer | |
Gear Box | Type 3 | Single helical, parallel axes, single stage reduction gearbox, outpur RPM to match Customers specs. |
Quality | Precision ground gears, profile corrected for low noise and high transmission efficiency. | |
Bearings | Hydrodynamically designed Journal and Journal cum Thrust bearings, white metal lined. | |
Service Factor | 1.8 to 2.0 | |
Lubricant System | Pressurized oil circulation to all bearings and gears of turbine and gearbox, with MOP and Electrically driven AOP, Emergency Hand Pump – DC motor driven pump on request. | |
Base Frame Cum Lube Sump | MS Fabricated, precision machined, with proviosn for lifting and grouting. Built in lube sump with level gauge, filler cum breather, drain and manholes for cleaning. | |
Couplings | Choice of flexible element with dist. Pc & or Gear / Jaw type couplings. | |
QSV Actuator | Double acting hydraulic cylinder. | |
Alternator & Electricals | Alternator 4 | 4-Pole, lT alternator, (415 to 440V), KVA rating to match Customer, brushless, self-excited, self-regulated, IP-21 Protection Class, 1500 RPM, 0.8PF, Winding temp. protection using PTC’s RTD’s and BTD’s on request. |
Integrated TG Set Panel | ACB / MCCB of suitable rating. Meters for V, A, kW, KWH, KVA, KVAR, PF, Hz Protection using Multi-function relay, Earth Leakage Relay Turbine control & health monitoring. | |
Instruments | Speed | Electronic speed pick-up with digital tachometer for speed indication and over speed trip setting. |
Temperature (Optional) | RTD’s with multi-channel scanner with relay output for alarm/trip. | |
Axial displ. (Optional) | Proximity sensor with indicating meter, alarm and trip. | |
Fail-Sage Trip & Alarm System | - Mechanical Over Speed trip - Axial displ. Trip - High brg. Temp. alarm - High casing pr. Alarm - Elecctronic Over Speed Trip - Low lube oil Pr. Trip - Filter Clog alarm - Breaker trip in the event of turbine trip. | |
Materials of Construction | Turbine Castings | Cr. Alloy Steel Casting |
Turbine Wheel | EN-19, Forged | |
Turbine shaft | EN-24, Forged | |
Rotor blades, nozzles & guide vanes | Hardened stainless steel for corrosion and erosion resistance. | |
Steam Seal | Split Carbon rings on SS Housing | |
Oil Seal | Phosphor bronze labyrinth | |
Bearings | White metal lined on steel | |
Gears | EN8/EN9 | |
Gear shafts | EN8/EN9 |
We are offering steam turbine for generating electricity from boilers, low pressure saturated steam boilers high pressure superheated steam boilers.
We have developed a revolutionary concept in Steam Turbines with a view to keep the cost to the barest minimum and enable small steam users to install a steam turbine.
How Low Cost Saturated Turbine is different from conventional Steam Turbines ?
A conventional Steam turbine will have three different modules integrated to generate electrical power namely :
Apart from the above the following sub-systems form part and parcel of any Steam Turbine Generation system.
Thus making the whole system quite expensive.
This Low cost Saturated Steam Turbine eliminates the gearbox, lubrication system, couplings and speed governing which drastically reduces the first cost to customer. The novel concept envisages the turbine to be mounted directly onto the shaft of an induction generator eliminating the items described in point 1, 2 and 3 above. This not only reduce the acquisition cost but also the recurring expenditure on maintenance spares and services, such as :
Low Cost Saturated Steam Turbine operates at moderate efficiency due to its lower operating speed (3000 RPM as compared to 5000 plus of a conventional turbine). It will generate anywhere between 70 to 100% power of a conventional turbine depending on customers steam parameters. Low Cost Saturated Steam Turbine is targeted at small steam users and for power generation in 40 to 500 kW range. It costs less than 50% of a conventional turbine thus making it an attractive proposition.
Additional Information:
Payment Terms : L/C, T/T
Delivery Time : 3 months
We are amidst the dependable Manufacturers, Exporters and Suppliers of the Zero Discharge System. The Zero Discharge System evaporates water from Pretreated Effluent in almost the same way as thermal evaporators, employing the principle of diffusion at normal temperature. To recapitulate the basic aspects of the novel design :
With above background, it becomes clear that the effluent has to be properly pretreated before it is pumped into Braj Projects Pvt.Ltd.'s ZDS involving; equalization, pH control, removal of volatile organics, removal of suspended solids and turbidity, and lastly adequate removal of dissolved impurities. There are basically two types of dissolved impurities in the effluent, organic and inorganic, manifesting themselves as COD, BOD, TOC, etc. and TDS. Firstly, the effluent has to be passed through a packed bed of activated carbon, granular form, with app surface area about 80-100sq meter per gram. It is well known that activated carbon of good quality possesses extremely good adsorptive for most of the organic impurities present in the textile effluents. Therefore, after passage thru carbon bed , most of the dissolved organics of the effluent would be removed, with optimum contact time and sufficient depth of the bed, say, .5m to 1.0meter and dia of about 0.5 to 0.75m.The carbon bed as usual would have distributors, supporting plate, mild steel shell, inlet and outlet and so on. After removal of organics in the carbon bed of adequate quantity, the effluent is passed through a mixed bed of anionic and cationic resins which are well known to remove inorganic salts from the effluent by the ion exchange process. This would be also made from mild steel shell lined with epoxy to withstand corrosion by the effluent. It would be a packed bed with usual connections like inlet, outlet, distributor etc. The anionic and cationic resins would be in the form of spherical particles packed to sufficient depth and adequate residence time. Both the carbon granules and resins are available in India and have been used in the industry for effluent/water treatment with a high degree of success over the last several decades. Their designs have been standardized in our country. The Overall Picture of Our ZDS Is As Follows
Typical Characteristics Of The Equalized Textile Effluent
Typical Characteristics of the Pretreated Effluent before Zero Discharge System
The packed beds of activated carbon and ion exchange resins are cylindrical, vertical columns with valves, pressure gauges, drains, level indicators, opening lids and man holes for cleaning and are self -supporting structures of about 2-3 feet diameter and 4-6 feet cylindrical heights, made from mild steel of about 4-6 mm plate and coated with epoxy paint. The present study on a pilot plant at Braj Projects Pvt.Ltd. over two years and exhaustive study of the commercial plant at a local chemical industry over the last 1.5 years have shown that there are no adverse effects of any kind either on the local climate or human beings or plantations in the vicinity of the ZDS plant as well as in the long ranges by the emissions from the ZDS. This is on the expected line technically also, because what is being discharged from the ZDS is water vapor well mixed with large amount of air and that too at highly elevated level of 50-60 feet from the ground. If we compare this with the discharges of the greenhouse gases from the boilers, driers, thermic fluid heaters and even multiple effect evaporators already approved by the regulatory authorities emitting vapors without mixing with air or the much -touted incinerators' gaseous emissions comprising carbon dioxide, carbon monoxide, heat and toxic substances as byproducts of combustion of the fossil fuels used for generation of heat/steam. This method of zero discharge is superior and much more eco-friendly on equivalent basis. Needless to mention, that like all other novel technologies emerging in the horizon in the global environmental scenario, the ZDS is also not cent per cent perfect, it does have a few limitations, however, if the industry has to opt for a zero discharge system that is very near to the sustainable, practical, cost effective and eco-friendly method of ensuring no liquid discharge. Braj Projects Pvt.Ltd.'s ZDS provides and tries to fill in the vacuum amongst the plethora of pseudo- zero discharge systems available in the Indian market. During the developmental process of the Zero Discharge System Braj Projects Pvt.Ltd. learnt that in one of the highly developed countries, such systems of very large capacities at industrial scale have been operating successfully for over 10-15 years. Now Braj Projects Pvt.Ltd. also has gone up to a full-fledged commercial plant employing this novel concept and it is of the opinion, based on exhaustive trials so far, that the system is techno-economically viable and sustainable remedy to the Zero Discharge compliance problem of the industry has ultimately arrived on the Indian horizon. Outcome of the Zero Discharge system
Price Range : Ranging from Rs. 5 Lakhs to 2 Crore
Additional Information:
Payment Terms : L/C
Packaging Details : Simple Air Worthy Packing
Delivery Time : 45 Days
Graph
Technical Specifications
Description | Size (MOC) | Capacity |
---|---|---|
Zero Discharge Tower (M.S.) | M.S | 55 feet |
Effluent Storage Tank (Brick Wall) | RCC /Brick | As needed |
Fresh Water Storage Tank (Brick ) For System cleaning purpose | Sintex | As needed |
High Pressure Pump (P) | C.I | - |
AIR COMPRESSOR (H) | - | - |
Pipings (2inch for Air & water) | M.S | - |
Filters | M.S. | Two nos. |
Additional Information: