Our Products
Leading Manufacturer, Supplier & Retailer of Fanless, Fill-Less zero maintenance cooling towers, fill less cooling towers, Zero Maintenance Cooling Towers, fan less cooling towers and Fanless Cooling Tower.
Energy Efficient FRP Induced Draft Counter Flow Cooling Towers. Most advance technology combined with Best Quality to create Most Beautiful and High Energy Efficient FRP Counter-flow Cooling Towers.
Additional Information:
Payment Terms : L/C
Delivery Time : 02 TO 06 WEEKS
Energy Efficient FRP Counter Flow Cooling Towers best suitable for any application. Best suitable for lower approach.
Additional Information:
Payment Terms : D/P, T/T, Western Union,
Delivery Time : 3 weeks
This tower design has been developed after detailed research and analysis of the engineering design. The design allows a substantial saving in space, power and water consumption.
Our State-of-Art technology is best suited to the industrial requirements as per Indian environmental condition.
Latest superior computer designed PVC FILLS offer maximum surface area with minimum resistatnce to Air Flow and hence lower power consumption which means lower annual electrical bills.
The high efficiency of the fans is achieved by a tapered and aerodynamic design of the fan blades. This dynamically balanced fan assembly ensures smoother operation, longer bearing & motor life.
Superior quality of FRP laminates with isothelic resin increases strength of the casing shell which reduces vibrations and it gives assurance of longer tower Life.
Neo Penta Glycol (NPG) gelcoat finish assures for UV protection and colour retention with superior surface finish and hence superior asthetic look.
Additional Information:
Payment Terms : L/C, T/T
Delivery Time : 4 - 8 Weeks
We supply/ manufacturer frp square counter flow cooling towers. It has class of its own.
Additional Information:
Payment Terms : L/C, T/T
Delivery Time : 02 week to 06 week