Related Category
Business Type
optional accessories rubber hand gloves. spare heaters. low water level cut off device to safeguard heaters against low water level burn out in built refrigeration system for curing at 27 deg c recommended accessories & consumbles the following accessories and consumables are not part of the standard suppl more...
The strength of concrete is generally estimated after 28 days by crushing field test cubes or cylinders made from the representative concrete used for the structure. The utility of ascertaining strength after 28 days is often questioned since by this time considerable concrete would have been placed and work more...
Accelerated Curing Tank having capacity to accommodate various sizes of concrete cube moulds or Cement mortar Cube Moulds, with a facility for accelerated curing by boiling water method up to temperature range : 100 ± 2 °C as per IS standard IS : 9013. Also it will have capacity for curing by warm water met more...
Get Quotes from Verified Suppliers
Accelerated Curing Tank is used for concrete testing purposes. The inner chamber of Accelerated Curing Tank offered by us is made of stainless steel and outer body is made of mild steel, which is duly powder coated. Tanks, that we offer, is suitable for accommodating 6 or 12 cube moulds of 150mm. The temperat more...
Standard Models Inside S.S. 304 with mirror polish & outside mild steel powder coated. GMP Models Inside S.S. 316 with mirror polish & outside stainless steel 304 with the dull buff finish. Construction “TEMPO” make cement curing tank is made of sturdy construction with stainless steel inn more...
The tank has been designed to accommodate 150mm/70.6mm cube moulds upto 36/72 cube mould and fully insulated, complete with a hinged lid, heater, thermostat and re-circulated pump. Provision of two removable racks allowing free circulation of water around each mould. The pump, drain valves and electrical equi more...
The strength of concrete is generally estimated after 28 days by crushing field test cubes or cylinders made from the representative concrete used for the structure. The utility of ascertaining strength after 28 days is often questioned since by this time considerable concrete would have been placed and work more...
Accelerated Curing Tank having capacity to accommodate 61218 Concrete Cubes of 150mm size with a facility for accelerated curing by Boiling water method up to temperature range : 100 +- 2 deg.C as per IS standard IS : 9013. Also it will have capacity for curing by warm water method at temperature 55 +- 2 deg. more...
the strength of concrete is generally estimated after 28 days by crushing field test cubes or cylinders made from the representative concrete used for the structure. The utility of ascertaining strength after 28 days is often questioned since by this time considerable concrete would have been placed and work more...
Curing Tanks and Accelerated Curing Tanks (AIM 355-1 to AIM 355-4, AIM 355-1 ACW/ACB, AIM 355-2 ACW/ACB) Application Curing Test Industry Civil Infrastructure Cement/RMC Construction Chemicals Dams & Tunnels Fly Ash Irrigation Railways Sleepers Real Estate Refractories Roads, Highways & Bridges Education A more...
Introduction The strength of concrete is generally estimated after 28 days by crushing field test cubes or cylinders made from the representative concrete used for the structure. The utility of ascertaining strength after 28 days is often questioned since by this time considerable concrete would have be more...
We are recognized among the reputed traders and suppliers of ACCELERATED CURING more...